The main bulk dredging of the bund alignment was carried out using
Scorpio with a final sweeping of the area undertaken by Warraber
prior to placement of bund material by Henry Walker Eltin. Dredged
material was pumped up to a maximum distance of 2.3km to reclamation
ponds. The majority of the distance was achieved primarily using
the pump on Scorpio but the assistance of a 2800hp booster pump
(commissioned for this project) was required when dredging was undertaken
at outer pumping limits.

Pipe launching at Darwin.
Works also included dredging the new container terminal area and
the area beyond the existing groyne to enable its expansion.
Following completion of these works Hall Contracting were engaged
by Thiess Pty Ltd (from July 2002 to March 2003) to undertake
dredging of the foundation for a further expansion of the groyne
area along with a Training Wall.