Southport Broadwater Parklands

Dredge: CSD Everglade
Client: Abigroup
Dates:
March to July 2009

The dredging for this landmark Gold Coast development was undertaken by Hall Contracting using CSD Everglade, 4.5km of pipeline and 3 booster pump stations.

Sand was dredged from the channels adjacent to Wave Break Island and pumped through 400mm pipeline to form 2 large beach areas.

20m long Elcorock T2Mega sandfilled geotextile containers were used as reclamation protection on the new fill area adjacent to the Southport